Centra Park Yatala Industrial Subdivision

Centra Park Yatala is a 140ha Industrial subdivision, situated on a steep site, with lots ranging in size from 2500m2 to 5ha. ACOR was involved in the planning and designing of infrastructure for all 4 stages of this $25.5M project, which included:

  • Major earthworks (1.6 Million m3)
  • 2.5km of retaining walls – reaching 13m in height and using all concrete product manufactured onsite
  • Utilisation of onsite material for pavements and as road base, backfill, etc

Consideration of environmental requirements for flora/fauna and utilisation of Bio Fuel by all machinery on site.