Joint User Hydrant Tank Farm Upgrade, Perth Airport

ACOR was engaged to provide 3D modelling and detail engineering for Mechanical, Structural, Civil, Drainage and Fire design for works associated with the construction of an additional bulk storage tank at Perth Airport. Work has included providing expert advice and solution modelling on bund design to cope with dynamic surge in the event of a catastrophic tank failure. An additional project has been designed for an upgrade to the main yard, in line with the client’s masterplan.