Oaks Ave, Dee Why

Under 4 separate contracts, ACOR carried out all design, documentation, tendering and project management of works to this 8-storey residential apartment complex, where the existing masonry balustrade system of the balconies had failed.

The dilapidated balustrades were removed and replaced with a new rendered and painted reinforced block / glass / aluminium system.

Extensive spalling remediation of floors was also undertaken adjacent to the balconies, due to magnesite (magnesium chloride) induced corrosion of reinforcement bars.

A new roof membrane system was installed with insulation boards and ballast protection and, finally new concrete driveways were placed throughout the complex.