A comprehensive upgrade to the existing Lutwyche City Shopping Centre.

Main Works
The works involved the extension of Woolworths towards Lutwyche Road which included a new suspended slab on ground and new roof extending over the Supermarket extension and new walls along Lutwyche Road.

A new loading dock was added to the ALDI tenancy along with strengthening the existing floor for Aldi; Extension of the building to Chalk Street; Conversion of Coles office into a child care plus a fitness centre which required a strengthening of the existing concrete roof slab with additional level above the existing roof in light weight frame.

Early Works
ACOR were engaged to undertake an Early Works package in advance of the main works.

The advance Early Works package comprises of four (4) separate components, being described, as follows:

  • New travellator
  • Food Court / Travellator surrounds and structural alterations
  • Medical precinct structural works
  • Under slab strengthening to New Aldi Location.